食海鮮果個迴旋處隔離個一輝倉!?
係嘅話就仲撚好笑 一輝果塊地只係可以做住宅同物流中心用途 仲要個場只可以星期一至六朝8晚8運作
https://www1.ozp.tpb.gov.hk/gist/apply/en_tc/A_YL-LFS_334_TC.pdf
喺呢塊地如作工業用途係要經城市規劃條例s 16申請planning permission
單係s 16嘅法定諮詢程序就要2個月 由零開始去到過到城規會起碼搞成年 仲未計城規會唔批
乜原來連間新廠都係非法架
621st RNTPC MEETING ON 22.02.2019
After deliberation, the Committee decided to approve the application on a temporary basis for a period of 3 years until 22.2.2022, on the terms of the application as submitted to the Town Planning Board (TPB) and subject to the following conditions:
“(a) no operation between 8:00 p.m. and 8:00 a.m., as proposed by the applicant, is allowed on the Site during the planning approval period;
(b) no operation on Sundays and public holidays, as proposed by the applicant, is allowed on the Site during the planning approval period;
(c) no storage of recyclable materials, dismantling, assembling, repairing or other workshop activities, as proposed by the applicant, are allowed on the Site at any time during the planning approval period;
(d) no vehicle is allowed to queue back to public road or reverse onto/from the public road at any time during the planning approval period;
(e) the submission of a revised drainage proposal within 3 months from the date of planning approval to the satisfaction of the Director of Drainage Services or of the TPB by 22.5.2019;
(f) in relation to (e) above, the implementation of the revised drainage proposal within 6 months from the date of planning approval to the satisfaction of the Director of Drainage Services or of the TPB by 22.8.2019;
(g) in relation to (f) above, the implemented drainage facilities shall be maintained at all times during the planning approval period;
(h) the implementation of the accepted landscape proposal within 6 months from the date of planning approval to the satisfaction of the Director of Planning or of the TPB by 22.8.2019;
(i) the submission of fire service installations proposal within 3 months from the date of planning approval to the satisfaction of the Director of Fire Services or of the TPB by 22.5.2019;
(j) in relation to (i) above, the implementation of fire service installations proposal within 6 months from the date of planning approval to the satisfaction of the Director of Fire Services or of the TPB by 22.8.2019;
(k) the provision of fencing within 3 months from the date of planning approval to the satisfaction of the Director of Planning or of the TPB by 22.5.2019;
(l) if any of the above planning conditions (a), (b), (c), (d) or (g) is not complied with during the approval period, the approval hereby given shall cease to have effect and shall be revoked immediately without further notice; and
(m) if any of the above planning conditions (e), (f), (h), (i), (j) or (k) is not complied with by the above specified date, the approval hereby given shall cease to have effect and shall on the same date be revoked without further notice.”